The Durabond GE 50 ton locomotive moving two carloads of pipe at the former Steelton Bethlehem Steel facility. |
Date:
2/14/2011 |
Location:
Highspire, PA Map  |
Views:
542 |
Collection Of:

Mike Thomas |
|
Author: Mike Thomas
|
 |
Picture Categories: |
This picture is part of album: Steelton & Highspire Railroad |