After coming up and off the Commercial, the coal loads have shoved back so the power can pick up the 7509 in the spur so the train can make Boyd Hill. |
Date:
5/8/2004 |
Location:
New Brighton, MN Map ![Show New Brighton on a rail map](/images/map_us.gif) |
Views:
259 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Douglas Hildebrandt |
Locomotives: |
Author: Douglas Hildebrandt
|
![Westob Coal Load](http://s3.amazonaws.com/rrpa_photos/4466/SP%20340%205-8-2004.jpg) |
Picture Categories: |
This picture is part of album: Wisconsin Central-Minneapolis 1 |