PW 3907 shoves 7 loads of demolition toward the Middletown yard. They will be dropped off there, and then the unit will go pull 3 empties from Primary Steel. After that, the 3 empties will be left in the yard, the 7 high-sided gondolas will be picked up (along with 4 others), and the train will go to Hartford. |